Abbotsford Law Courts |
Abbotsford |
Canada |
Under construction |
Designed for LEED® Gold certification |
AgriBio, Centre for AgriBioscience |
Melbourne |
Australia |
Operational |
5 star green rating from the Australian Green Building council.Energy efficient lighting and cooling and extensive recycled content. |
Archives of Ontario |
York |
Canada |
Operational |
LEED® Silver certified |
Barwon Water Biosolids Management |
Geelong |
Australia |
Operational |
"No waste" sewerage system where 100% of water and biosolids are committed to sustainable use.Achieved T1 Treatment Grade - beneficial use of dried biosolids, 100% recycling as a farm fertiliser or fossil fuel replacement.Zero odour emission. |
BC Cancer Agency for the North |
Prince George |
Canada |
Operational |
LEED® Gold certification |
Brampton Civic Hospital |
Brampton |
Canada |
Operational |
|
Centre for Addiction and Mental Health Phase 1C |
Toronto |
Canada |
Under construction |
Designed for LEED® Gold certification |
Communications Security Establishment Canada |
Ottawa |
Canada |
Operational |
LEED® Gold certified |
Cook County Hospital Redevelopment |
Chicago |
USA |
Under construction |
Designed for LEED® Silver certification |
Corner Brook Long-Term Care |
Corner Brook |
Canada |
Operational |
|
DC Smart Street Lighting Project |
Washington |
USA |
Operational |
|
Humber River Hospital |
Toronto |
Canada |
Operational |
LEED® Gold Certified |
Interior Heart and Surgical Centre |
Kelowna |
Canada |
Operational |
LEED® Gold certified |
Library and Archives Canada's Gatineau 2 Project |
Gatineau |
Canada |
Under construction |
|
Metrolinx East Rail Maintenance Facility |
Whitby |
Canada |
Operational |
Designed for LEED® Gold certification |
Milton District Hospital |
Milton |
Canada |
Operational |
LEED® Gold certified |
Ministry of Government Services New Data Centre |
Guelph |
Canada |
Operational |
LEED® Gold certified |
New Adult Mental Health and Addictions Facility |
St. John’s |
Canada |
Under construction |
|
NHS Health Care Complex and Walker Family Cancer Centre |
Niagara |
Canada |
Operational |
LEED® Gold certified |
North Bay Regional Health Centre |
North Bay |
Canada |
Operational |
LEED® certified |
Okanagan Correctional Centre |
Oliver |
Canada |
Operational |
Designed for LEED® Gold certification |
Ontario Line – Rolling Stock, Systems, Operations and Maintenance (RSSOM) Project |
Toronto |
Canada |
Under construction |
|
Peel Memorial Centre for Integrated Health and Wellness |
Brampton |
Canada |
Operational |
LEED® Silver Certification |
Pennsylvania Turnpike Commission Fiber Infrastructure O&M and Commercialization Services |
|
USA |
Operational |
|
Purdue University Student Housing Facilities |
West Lafayette |
USA |
Operational |
|
Queensland Schools |
Multiple locations |
Australia |
Operational |
Increased insulation to walls, roofs and window configurations that maximise cross flow ventilation.Sunlight is maximised to provide a well-lit and insulated learning environment.Designed to a 4 star green star rating. |
Royal Ottawa Hospital Facility |
Ottawa |
Canada |
Operational |
|
Single LEAP 1 |
Regional areas |
Australia |
Operational |
Designed to meet all of the Department of Defence Environmentally sustainable Development Goals (ESD). Plumbing has a 3-star WELS rating to achieve a 30% reduction in the mains water consumption.Waste management and minimisation through segregation and collection of recyclable waste. |
Single LEAP 2 |
Multiple locations |
Australia |
Operational |
Designed to meet all of the Department of Defence Environmentally sustainable Development Goals (ESD).Plumbing has a 3-star WELS rating to achieve a 30% reduction in the mains water consumption.Waste management and minimisation through segregation and collection of recyclable waste. |
South Australian Police and Courts |
Multiple locations |
Australia |
Operational |
Low energy lighting design utilising T5 fittings.External shading devices to reduce heat load and air-conditioning.Solar hot water services and time controlled garden watering systems. |
St Joseph's Healthcare Hamilton |
Hamilton |
Canada |
Operational |
LEED® Gold certified |
Thunder Bay Consolidated Courthouse |
Thunder Bay |
Canada |
Operational |
LEED® Silver certified |
University of Idaho Utility System P3 |
Moscow |
USA |
Under construction |
|
Waterloo Light Rapid Transit |
Region of Waterloo |
Canada |
Operational |
Designed for LEED® certification |
William H. Gray III 30th Street Station Redevelopment |
Philadelphia |
USA |
Operational |
|